Details
| Founded: | N/A |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $5,000,000+ |
| Ratings: |
4.7
6 Reviews
|
Industries Served
About
Zoozler was established with one purpose that is to change modern technology from a weapon of the few into a vehicle for all. They make completely in-house & structure their core around constant improvement, clarity, innovation, and most importantly results for your company. To provide the greatest quality, most scalable & effective technical solutions to fuel business growth around the globe.
Zoozler Reviews
Technically sharp, commercially sensible, and genuinely easy to work with throughout
Airi Kobayashi / Head of Product Development | May 16, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Aug 2025 - Apr 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Nagoya, Japan |
Questions & Answers
Post-release incidents dropped by half within three months of this program starting
Rodrigo Cardoso / VP of Technology | Apr 30, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our headcount had grown faster than our platform engineering depth. We needed an experienced team to close that gap while we hired, without letting quality or the roadmap slip in the meantime.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Oct 2025 - Mar 2026 |
| Business Type: | Information Technology |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Marc-Antoine Girard / VP of Innovation | Apr 19, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Warehouse errors were becoming visible to clients, not just internal reporting. A modernized WMS was already the agreed direction internally — we just needed someone to actually build it.
| 4.5 Overall Rating |
| 4.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | May 2025 - Mar 2026 |
| Business Type: | Logistics & Supply Chain |
|---|---|
| Location: | Montreal, Canada |
Questions & Answers
Execution matched the proposal on every dimension that actually mattered to us
Aoibhinn Molloy / Director of Product | Apr 03, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
First notice of loss was taking us three days on average against a market benchmark of under four hours. Automating that intake and triage step became the clear priority.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | POS System Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jun 2025 - Mar 2026 |
| Business Type: | Insurance |
|---|---|
| Location: | Galway, Ireland |
Questions & Answers
Every line item in the scope was delivered, on schedule, and passed our review without rework
Étienne Marchand / CTO | Mar 28, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Mar 2025 - Jan 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | Ottawa, Canada |
Questions & Answers
Post-release incidents dropped by half within three months of this program starting
Matilda Osborne / Head of Engineering | Feb 18, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our actuarial models had outgrown the reporting pipeline feeding them, and the resulting data lag was introducing real risk into pricing decisions the business wasn't comfortable carrying anymore.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | May 2025 - Nov 2025 |
| Business Type: | Insurance |
|---|---|
| Location: | Adelaide, Australia |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

