Details
| Founded: | 2011 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.2
8 Reviews
|
Industries Served
About
With 15 years of experience & expertise, their services come with a new approach connected with knowledge, creativity, and energy. They offer a great blend of top-notch services at very affordable prices. Their highly skilled & trained experts help you in a building, strengthening & connecting your business to the World Wide Web. They continuously try to give you with the most cost-effective and latest solutions for all your IT requirements.
Zoop Reviews
Changed how our engineers think about release risk, not just how fast they can ship
Soo-Ah Yoon / Director of Platform | May 08, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Daegu, South Korea |
Questions & Answers
Got the outcome we asked for, delivered the way we needed it, by people we'd hire again
Aoibhinn Molloy / Director of Product | May 07, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our trading platform had been patched together for close to a decade. Latency was creeping up, technical debt was compounding, and a proper rebuild had stopped being optional.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Apr 2026 |
| Business Type: | Financial Services |
|---|---|
| Location: | Galway, Ireland |
Questions & Answers
Delivered the sales visibility we'd been requesting internally for three years, in fourteen weeks
Rodrigo Cardoso / VP of Technology | Mar 21, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CRM Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Consolidated seven legacy systems down into one coherent data model
Angus Fairbanks / Chief Digital Officer | Mar 18, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Unplanned downtime had become our biggest single cost line, and our own data suggested predictive maintenance could fix most of it — if we had the infrastructure to act on the signal.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Brisbane, Australia |
Questions & Answers
Execution matched the proposal on every dimension that actually mattered to us
Hamish Bellamy / GM of Technology | Feb 06, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.5 Overall Rating |
| 4.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | POS System Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | May 2025 - Jan 2026 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Melbourne, Australia |
Questions & Answers
Sensor network and the analytics layer on top were both handled by people who understood each half
Marc-Antoine Girard / VP of Innovation | Jan 28, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our regulatory submission timelines needed a document platform that could handle version control, permissions, and audit trails at a scale our existing tools were never built for.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Dec 2024 - Oct 2025 |
| Business Type: | Pharmaceuticals & Biotechnology |
|---|---|
| Location: | Montreal, Canada |
Questions & Answers
Scaled from a ten-unit pilot to full fleet deployment without a single architectural rework
Fiona McAllister / Chief Technology Officer | Jan 27, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Apr 2025 - Dec 2025 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Glasgow, UK |
Questions & Answers
The return on this investment outpaced the business case we originally approved
Grayson Whitfield / VP of Engineering | Jan 05, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Grid modernization funding required us to prove demand-response capability. The models existed on paper — we needed engineers to actually build and run them in production.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Industry-Specific Solutions |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Feb 2025 - Nov 2025 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Boston, USA |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

