Details
| Founded: | 2011 |
|---|---|
| Hourly Rates: | $25 - $49 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $50,000+ |
| Ratings: |
4.1
6 Reviews
|
Industries Served
About
vBote is a leading mobile app development company. They provide a kind of key knowledge-based services that cover the development and support of core business processes. Their focus is to give quality and complete services to their clients. Their aim of being integrated, creative, unique, and committed is greater than ever.
vBote Reviews
This engagement shifted our culture as much as it shifted our tooling
Roisin Cassidy / VP of Product Engineering | May 30, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
The shift to EVs created dealer network management needs our existing system was never designed for. A targeted rebuild was the path the leadership team had already agreed on.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | May 2025 - Mar 2026 |
| Business Type: | Automotive |
|---|---|
| Location: | Belfast, UK |
Questions & Answers
Gameplay feel matched the original design intent — harder to nail than most people assume
Marcus Teo / CTO | May 01, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
We hold vendors to the same standard our own clients hold us to, so the bar for this engagement was never going to be low. We needed a partner comfortable being measured against it.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Oct 2025 - Apr 2026 |
| Business Type: | Information Technology |
|---|---|
| Location: | Singapore |
Questions & Answers
Cut our monthly infrastructure bill by more than a third with no drop in performance
Alexis Faraday / Chief Digital Officer | Mar 08, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Oct 2025 - Feb 2026 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Miami, USA |
Questions & Answers
Fast, accessible, responsive — every box checked, every deadline hit along the way
Elin Holmqvist / Head of Product Engineering | Feb 22, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Web Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Uppsala, Sweden |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Henrik Schuster / VP of Technology | Feb 07, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Mar 2025 - Jan 2026 |
| Business Type: | Aerospace & Defense |
|---|---|
| Location: | Bremen, Germany |
Questions & Answers
Smart contract audit was rigorous enough that our legal team signed off without a single note
Rodrigo Cardoso / VP of Technology | Jan 25, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.0 Overall Rating |
| 4.5 Quality |
| 3.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Feb 2025 - Dec 2025 |
| Business Type: | Construction |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

