Details
| Founded: | 2013 |
|---|---|
| Hourly Rates: | $150 - $199 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $100,000+ |
| Ratings: |
4.8
6 Reviews
|
Industries Served
About
Thy engages with clients by a rigorous consulting way that distills your product to its core emotional elements, this lets them know your user in a way that is unique. They are entrepreneurs and industry experts that set our clients up for victory. They listen exactly and speak creativity and honestly, their processes are open, where you are required in every step and are part of our team.
SWARM Reviews
Started as a single project and earned a permanent spot on our preferred vendor list
Min-Jun Kang / VP of Engineering | May 29, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our LMS had been designed for a classroom-only world, and two years of declining satisfaction scores made the hybrid-delivery gaps impossible to ignore any longer.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Industry-Specific Solutions |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Sep 2025 - Apr 2026 |
| Business Type: | Education |
|---|---|
| Location: | Busan, South Korea |
Questions & Answers
Migrated without the outages and rollback drama our first attempt at this produced
Cormac Whelan / VP of Engineering | May 08, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Cork, Ireland |
Questions & Answers
Editorial team adopted this without escalating a single support ticket
Nicolas Fontaine / Directeur Technique | Apr 16, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | May 2025 - Jan 2026 |
| Business Type: | Education |
|---|---|
| Location: | Lyon, France |
Questions & Answers
Multi-region uptime has held above 99.9 percent since the day we went live
Roisin Cassidy / VP of Product Engineering | Mar 03, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Our campaign workflow had sprawled across a dozen disconnected tools with constant manual reconciliation. It was slowing us down and introducing errors we couldn't afford.
| 5.0 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Advertising & Marketing |
|---|---|
| Location: | Belfast, UK |
Questions & Answers
The return on this investment outpaced the business case we originally approved
Amal Al-Hosani / Head of Digital Strategy | Feb 05, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
New traceability legislation brought a hard serialization deadline. Our supply chain system needed targeted, specialist development to meet it — general-purpose expertise wasn't going to cut it.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | POS System Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Sep 2025 - Dec 2025 |
| Business Type: | Pharmaceuticals & Biotechnology |
|---|---|
| Location: | Dubai, UAE |
Questions & Answers
Took us from on-prem to cloud-native on a timeline two other vendors called unrealistic
Franziska Wagner / Chief Innovation Officer | Jan 23, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jan 2025 - Nov 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Frankfurt, Germany |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

