Details
| Founded: | 2000 |
|---|---|
| Hourly Rates: | $100 - $149 |
| Employees: | 50 - 249 |
| Avg. Project Cost: | $25,000+ |
| Ratings: |
4.6
6 Reviews
|
Industries Served
About
It is an award-winning mobile app development company. They give cutting edge is our desire to find out their customers’ business drivers, the risks they encounter and the core principles of their business management. This way they can assign a high-quality standard to each task and fully comply with all the needs in the most exhaustive way.
Spherexx Reviews
Scaled from a ten-unit pilot to full fleet deployment without a single architectural rework
Femke Visser / Head of Platform Engineering | Apr 13, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Dec 2025 - Mar 2026 |
| Business Type: | Human Resources |
|---|---|
| Location: | The Hague, Netherlands |
Questions & Answers
Built for real-world constraints, not just for how it would read in a pitch deck
Rashid Al-Marzouqi / Chief Technology Officer | Apr 02, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Education |
|---|---|
| Location: | Sharjah, UAE |
Questions & Answers
Checkout completion rate improved from day one of the redesign going live
Tanner Ridgeway / VP of Operations Technology | Mar 31, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
The handoff between our clinic system and our patient app kept breaking in the same places. We needed a partner willing to own that integration end to end, not just patch it again.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | E-commerce Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Oct 2025 - Dec 2025 |
| Business Type: | Healthcare |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Freed our analysts from repetitive number-crunching to focus on the interpretation instead
Morgan Ellsworth / Head of Digital Health | Jan 11, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Expanding internationally meant we suddenly needed multi-currency, multi-language, and multi-warehouse support that our existing platform simply wasn't architected for.
| 5.0 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AI & Machine Learning |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Feb 2025 - Dec 2025 |
| Business Type: | Retail & E-commerce |
|---|---|
| Location: | Phoenix, USA |
Questions & Answers
Had something running in production for the board to see inside of two months
Margaux Lefèvre / Head of Digital Products | Jan 11, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
The handoff between our clinic system and our patient app kept breaking in the same places. We needed a partner willing to own that integration end to end, not just patch it again.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AI & Machine Learning |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Mar 2025 - Oct 2025 |
| Business Type: | Healthcare |
|---|---|
| Location: | Nice, France |
Questions & Answers
Went from whitepaper to mainnet without a single incident worth mentioning
Marc-Antoine Girard / VP of Innovation | Jan 09, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.0 Quality |
| 5.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Montreal, Canada |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

