Details
| Founded: | 2008 |
|---|---|
| Hourly Rates: | $50 - $99 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $50,000+ |
| Ratings: |
4.8
8 Reviews
|
Industries Served
About
It is a web and mobile app development company. They work very exactly with their clients helping them away just product development. They take in ideas and add value to their product offering. They believe in out of box thinking and driving their limits to make an innovation to grow their client’s businesses. They hold their ethics dear to their hearts and believe in clarity with their clients in whatever they do.
Snyxius Technologies Reviews
Brought coherence to a product carrying four years of accumulated visual inconsistency
Faisal Al-Dosari / Head of Innovation | Jun 04, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our connected vehicle platform needed to handle telemetry from a growing EV fleet while also managing over-the-air update rollouts, and nothing off the shelf handled both well.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jun 2025 - Apr 2026 |
| Business Type: | Automotive |
|---|---|
| Location: | Dammam, Saudi Arabia |
Questions & Answers
Kept every bit of the old site's SEO equity while adding the features we actually needed
Ritika Bhattacharya / VP of Product | May 20, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 5.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Aug 2025 - Apr 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Ahmedabad, India |
Questions & Answers
Post-release incidents dropped by half within three months of this program starting
Hamish Bellamy / GM of Technology | May 16, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Dynamic pricing had been run manually for years. We knew the revenue upside was real but had no in-house way to build the models and wire them into the booking engine.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | May 2025 - Mar 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Melbourne, Australia |
Questions & Answers
Got our board, our CTO, and engineering aligned on strategy for the first time in years
Bianca Alvarado / Chief Product Officer | May 06, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 5.0 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Nov 2025 - Mar 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | San Diego, USA |
Questions & Answers
Embedded deeply enough to understand our business, not just our ticket backlog
Kenji Watanabe / Director of IT Strategy | May 03, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 5.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jul 2025 - Apr 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Yokohama, Japan |
Questions & Answers
Hit a 4.7 average in the App Store within the first six weeks of release
Matilda Osborne / Head of Engineering | Apr 30, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jun 2025 - Mar 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Adelaide, Australia |
Questions & Answers
Our data science team became genuinely productive for what felt like the first time
Karthik Iyengar / Head of Platform | Apr 12, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
First notice of loss was taking us three days on average against a market benchmark of under four hours. Automating that intake and triage step became the clear priority.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Data & Analytics |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Insurance |
|---|---|
| Location: | Coimbatore, India |
Questions & Answers
Execution matched the proposal on every dimension that actually mattered to us
Femke Visser / Head of Platform Engineering | Apr 09, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Sep 2025 - Mar 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | The Hague, Netherlands |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

