Details
| Founded: | 2010 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 50 - 249 |
| Avg. Project Cost: | $25,000+ |
| Ratings: |
4.1
8 Reviews
|
Industries Served
About
Smashing Boxes is a leading technology lab that associates with clients, taking a combined way to solving complex enterprise problems. They combine strategy, design, and building with a constant dose of entrepreneurial vision and just the best amount of disruptive industry. They believe successful products are the outcome of best partnerships. It is one of the best mobile app development company.
Smashing Boxes Reviews
Execution matched the proposal on every dimension that actually mattered to us
Min-Jun Kang / VP of Engineering | May 25, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Matter management had quietly become a real drag on our fee earners' time — every hour on admin was an hour not spent on billable work. The case for fixing it wrote itself.
| 4.0 Overall Rating |
| 3.5 Quality |
| 3.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Nov 2025 - Apr 2026 |
| Business Type: | Legal Services |
|---|---|
| Location: | Busan, South Korea |
Questions & Answers
The infrastructure paid for itself inside of two quarters
Rodrigo Cardoso / VP of Technology | Apr 13, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Grid modernization funding required us to prove demand-response capability. The models existed on paper — we needed engineers to actually build and run them in production.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Attribution questions we'd given up asking are now answerable in a single dashboard
Hamish Bellamy / GM of Technology | Apr 09, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Buyer behavior had gone fully digital-first and our search experience had quietly become a liability. It needed to match the quality of the listings it was supposed to represent.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Digital Marketing |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | May 2025 - Jan 2026 |
| Business Type: | Real Estate |
|---|---|
| Location: | Melbourne, Australia |
Questions & Answers
Resolved a network fault at 2am before a single person walked into the office
Anton Berggren / Chief Technology Officer | Apr 06, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Oct 2025 - Feb 2026 |
| Business Type: | Fashion & Apparel |
|---|---|
| Location: | Malmö, Sweden |
Questions & Answers
Two years post-launch and our engineers still hold this codebase up as the standard to match
Mahnoor Sheikh / Head of Technology | Mar 29, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our field service system hadn't seen a serious update in years, and a growing technician headcount combined with increasingly complex jobs had exposed every one of its limits.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jun 2025 - Mar 2026 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Faisalabad, Pakistan |
Questions & Answers
Presented real trade-offs instead of a single pre-decided answer dressed up as options
Kenji Watanabe / Director of IT Strategy | Mar 07, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Our client portal hadn't been touched since it launched years earlier, and clients had started comparing it unfavorably to competitors' portals in live pitches.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jun 2025 - Feb 2026 |
| Business Type: | Legal Services |
|---|---|
| Location: | Yokohama, Japan |
Questions & Answers
Delivered with the change management and documentation a project this size actually needs
Reem Al-Ghamdi / VP of Engineering | Mar 05, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Oct 2025 - Jan 2026 |
| Business Type: | Education |
|---|---|
| Location: | Riyadh, Saudi Arabia |
Questions & Answers
Gameplay feel matched the original design intent — harder to nail than most people assume
Grayson Whitfield / VP of Engineering | Feb 27, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Oct 2025 - Jan 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Boston, USA |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

