Details
| Founded: | 2005 |
|---|---|
| Hourly Rates: | $150 - $199 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $50,000+ |
| Ratings: |
4.6
8 Reviews
|
Industries Served
About
They have been ruling the hearts of a large clientele for being always glowing in maintain the leading mobile app development ideas. They think in a regular road developing towards solving the client’s company goals & owns an exceptional team of innovative minds. For them, it is necessary to follow a user-centric method & maintain an open conversation with their clientele.
SmartLogic Reviews
Delivered exactly what the brief asked for, then kept improving past that point anyway
Tanner Ridgeway / VP of Operations Technology | May 05, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Oct 2025 - Mar 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Resolved a network fault at 2am before a single person walked into the office
Rodrigo Cardoso / VP of Technology | Mar 28, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Solved a trust problem between our partners that we'd been arguing about for three years
Percy Wren / Director of eCommerce | Feb 27, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Matter management had quietly become a real drag on our fee earners' time — every hour on admin was an hour not spent on billable work. The case for fixing it wrote itself.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Jan 2026 |
| Business Type: | Legal Services |
|---|---|
| Location: | Birmingham, UK |
Questions & Answers
Firmware, cloud layer, and dashboard actually talk to each other cleanly — rarer than it should be
Griffin Ashcombe / Managing Director, Tech | Feb 17, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
The shift to EVs created dealer network management needs our existing system was never designed for. A targeted rebuild was the path the leadership team had already agreed on.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Oct 2025 - Jan 2026 |
| Business Type: | Automotive |
|---|---|
| Location: | San Francisco, USA |
Questions & Answers
A team that clearly played the game obsessively before building a single feature
Konstantin Bauer / Leiter Digitalisierung | Feb 14, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Our lean manufacturing push needed real-time OEE data at the line level, and our existing systems could only produce it through hours of manual spreadsheet work each week.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Apr 2025 - Nov 2025 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Munich, Germany |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Soo-Ah Yoon / Director of Platform | Feb 12, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Sep 2025 - Dec 2025 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Daegu, South Korea |
Questions & Answers
Accessibility work broadened our reach and impressed clients we didn't expect it to matter to
Delphine Rousseau / Director of Platform Engineering | Feb 03, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 4.5 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Feb 2025 - Nov 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Vancouver, Canada |
Questions & Answers
Sales adopted it within the first week — no complaints, no holdouts
Cormac Whelan / VP of Engineering | Jan 31, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CRM Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Mar 2025 - Dec 2025 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Cork, Ireland |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

