Details
| Founded: | 2013 |
|---|---|
| Hourly Rates: | $100 - $149 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $100,000+ |
| Ratings: |
4.3
8 Reviews
|
Industries Served
About
It is a good mobile app development company. Their aim is to help their clients achieve their digital transformation by developing digital products that are true to their brands. They use cutting-edge technologies to develop their businesses in significant, measurable ways. They support them by each step of the planning, creation, development and product strategy.
Samsao Reviews
Closed the operational blind spots we'd been working around for longer than we'd like to admit
Cormac Whelan / VP of Engineering | May 20, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Feb 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Cork, Ireland |
Questions & Answers
Execution matched the proposal on every dimension that actually mattered to us
Delphine Rousseau / Director of Platform Engineering | May 04, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | POS System Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Oct 2025 - Feb 2026 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Vancouver, Canada |
Questions & Answers
Went from whitepaper to mainnet without a single incident worth mentioning
Airi Kobayashi / Head of Product Development | May 03, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Sep 2025 - Apr 2026 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Nagoya, Japan |
Questions & Answers
Core Web Vitals scores validated every performance decision they pushed us to make
Matilda Osborne / Head of Engineering | Apr 24, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Web Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Adelaide, Australia |
Questions & Answers
Smart contract audit was rigorous enough that our legal team signed off without a single note
Bartosz Nowicki / Head of Development | Mar 31, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Oct 2025 - Jan 2026 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Kraków, Poland |
Questions & Answers
Their architecture review steered us away from a vendor decision we would have regretted
Grayson Whitfield / VP of Engineering | Mar 29, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jun 2025 - Jan 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Boston, USA |
Questions & Answers
Execution matched the proposal on every dimension that actually mattered to us
Anton Berggren / Chief Technology Officer | Jan 15, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jun 2025 - Dec 2025 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Malmö, Sweden |
Questions & Answers
Had something running in production for the board to see inside of two months
Margaux Lefèvre / Head of Digital Products | Jan 08, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Our actuarial models had outgrown the reporting pipeline feeding them, and the resulting data lag was introducing real risk into pricing decisions the business wasn't comfortable carrying anymore.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AI & Machine Learning |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Sep 2025 - Dec 2025 |
| Business Type: | Insurance |
|---|---|
| Location: | Nice, France |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

