Details
| Founded: | 2005 |
|---|---|
| Hourly Rates: | $25 - $49 |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $25,000+ |
| Ratings: |
4.5
6 Reviews
|
Industries Served
About
They create strong and recognized brands while at the same time find the best possible ways to communicate their values, all in order to facilitate placement on the market, increase sales and competitiveness as well as to achieve business aims. They keep abreast with fast-changing trends & perform advanced technology, creativity and clear expertise in every project they take up.
Prospekt Reviews
Our SRE team now points new hires to this setup as the reference example
Agnieszka Zielińska / CTO | Jun 10, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
We hold vendors to the same standard our own clients hold us to, so the bar for this engagement was never going to be low. We needed a partner comfortable being measured against it.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Dec 2025 - May 2026 |
| Business Type: | Information Technology |
|---|---|
| Location: | Poznań, Poland |
Questions & Answers
Multi-region uptime has held above 99.9 percent since the day we went live
Cormac Whelan / VP of Engineering | Jun 08, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Our lean manufacturing push needed real-time OEE data at the line level, and our existing systems could only produce it through hours of manual spreadsheet work each week.
| 4.5 Overall Rating |
| 4.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Sep 2025 - Mar 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Cork, Ireland |
Questions & Answers
The research surfaced friction points we'd stopped noticing because they'd always been there
Alexis Faraday / Chief Digital Officer | Apr 24, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our campaign workflow had sprawled across a dozen disconnected tools with constant manual reconciliation. It was slowing us down and introducing errors we couldn't afford.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Sep 2025 - Feb 2026 |
| Business Type: | Advertising & Marketing |
|---|---|
| Location: | Miami, USA |
Questions & Answers
Optimized for actual business outcomes instead of the usual vanity metrics
Amal Al-Hosani / Head of Digital Strategy | Mar 29, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Digital Marketing |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Aug 2025 - Dec 2025 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Dubai, UAE |
Questions & Answers
Delivered with the change management and documentation a project this size actually needs
Sameer Kapoor / Chief Data Officer | Mar 21, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.5 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | May 2025 - Dec 2025 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Gurugram, India |
Questions & Answers
Gameplay feel matched the original design intent — harder to nail than most people assume
Hamza Farooqi / Co-Founder & CTO | Feb 17, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
New open banking rules meant our API layer needed rebuilding from scratch, with compliance designed in from the start rather than patched on afterward.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Mar 2025 - Nov 2025 |
| Business Type: | Financial Services |
|---|---|
| Location: | Karachi, Pakistan |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

