Details
| Founded: | 2014 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.8
6 Reviews
|
Industries Served
About
It is a UK mobile app & website development company which makes it simple to run your business. They make it very simple for your business to cover technology with mobile applications. They are a mobile app and website development company using cutting-edge technologies to provide bespoke Mobile Apps & Websites to their clients. They will talk you about the options, define how an app is developed and tested and get your app running.
Opmen Reviews
They were thinking mobile-first before we'd even finished writing the brief
Étienne Marchand / CTO | Jun 09, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our lean manufacturing push needed real-time OEE data at the line level, and our existing systems could only produce it through hours of manual spreadsheet work each week.
| 5.0 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Ottawa, Canada |
Questions & Answers
Gameplay feel matched the original design intent — harder to nail than most people assume
Ananya Raman / Director of Engineering | Jun 08, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
New digital service standards required every citizen-facing application to hit accessibility and performance benchmarks our legacy systems simply couldn't reach. Patching them wasn't realistic.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Oct 2025 - Mar 2026 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Got the outcome we asked for, delivered the way we needed it, by people we'd hire again
Bianca Alvarado / Chief Product Officer | Apr 18, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Oct 2025 - Mar 2026 |
| Business Type: | Fashion & Apparel |
|---|---|
| Location: | San Diego, USA |
Questions & Answers
Technically sharp, commercially sensible, and genuinely easy to work with throughout
Roisin Cassidy / VP of Product Engineering | Apr 09, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Our regulatory submission timelines needed a document platform that could handle version control, permissions, and audit trails at a scale our existing tools were never built for.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Pharmaceuticals & Biotechnology |
|---|---|
| Location: | Belfast, UK |
Questions & Answers
Test automation got adopted by developers as a genuine tool, not a box-ticking exercise
Bartosz Nowicki / Head of Development | Mar 13, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
First notice of loss was taking us three days on average against a market benchmark of under four hours. Automating that intake and triage step became the clear priority.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Insurance |
|---|---|
| Location: | Kraków, Poland |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Henrik Schuster / VP of Technology | Feb 04, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Sep 2025 - Dec 2025 |
| Business Type: | Gaming & Gambling |
|---|---|
| Location: | Bremen, Germany |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

