Details
| Founded: | 2006 |
|---|---|
| Hourly Rates: | $50 - $99 |
| Employees: | 50 - 249 |
| Avg. Project Cost: | $5,000,000+ |
| Ratings: |
4.1
6 Reviews
|
Industries Served
About
They design & develops web, mobile apps, and e-commerce sites. They are a result-driven company that prides itself on the consultative parties where they have developed with every type of companies. Their team of experts uses proven strategies to deliver the best results for your company. With positive communication, they can extend your businesses' online perceptibility with unmatched results.
Offshorent Pvt Ltd Reviews
Smart contract audit was rigorous enough that our legal team signed off without a single note
Kenji Watanabe / Director of IT Strategy | Jun 09, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Grid modernization funding required us to prove demand-response capability. The models existed on paper — we needed engineers to actually build and run them in production.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jan 2026 - Apr 2026 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Yokohama, Japan |
Questions & Answers
Accessibility work broadened our reach and impressed clients we didn't expect it to matter to
Soo-Ah Yoon / Director of Platform | Mar 11, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Oct 2025 - Feb 2026 |
| Business Type: | Aerospace & Defense |
|---|---|
| Location: | Daegu, South Korea |
Questions & Answers
Certification time dropped and trainees actually prefer the VR module over the old process
Preston Locke / Director of Technology | Feb 15, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
First time our online and in-store inventory have shown the same numbers
Ananya Raman / Director of Engineering | Feb 03, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | E-commerce Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Apr 2025 - Nov 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Outperformed our old in-house desk on every SLA metric we track
Delphine Rousseau / Director of Platform Engineering | Jan 29, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Mar 2025 - Nov 2025 |
| Business Type: | Fashion & Apparel |
|---|---|
| Location: | Vancouver, Canada |
Questions & Answers
Friday deployments finally feel routine instead of something to brace for
Fiona McAllister / Chief Technology Officer | Jan 20, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Buyer behavior had gone fully digital-first and our search experience had quietly become a liability. It needed to match the quality of the listings it was supposed to represent.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | May 2025 - Nov 2025 |
| Business Type: | Real Estate |
|---|---|
| Location: | Glasgow, UK |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

