Details
| Founded: | 2002 |
|---|---|
| Hourly Rates: | $25 - $49 |
| Employees: | 50 - 249 |
| Avg. Project Cost: | $50,000+ |
| Ratings: |
4.8
8 Reviews
|
Industries Served
About
It is a mature software development house with over 14 years of successful functioning on the market. Clients choose us for their competitive prices and high quality of services, flexibility and nearshore location. Their aim defines our purpose as a company and works as a standard for every action and decision they make. They provide solid growth of incomes for the shareholders and assure a productive environment for their employees.
OCSICO Reviews
Designed around how our users actually behave, not the persona slide we'd been assuming
Henrik Schuster / VP of Technology | May 24, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Oct 2025 - Feb 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Bremen, Germany |
Questions & Answers
Execution matched the proposal on every dimension that actually mattered to us
Bartosz Nowicki / Head of Development | May 10, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 5.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Dec 2025 - Apr 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Kraków, Poland |
Questions & Answers
Post-release incidents dropped by half within three months of this program starting
Amal Al-Hosani / Head of Digital Strategy | May 02, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Apr 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | Dubai, UAE |
Questions & Answers
Collapsed a two-week release cycle down to same-day deployments
Tanner Ridgeway / VP of Operations Technology | Apr 14, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Jan 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Smart contract audit was rigorous enough that our legal team signed off without a single note
Faisal Al-Dosari / Head of Innovation | Apr 06, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | May 2025 - Mar 2026 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Dammam, Saudi Arabia |
Questions & Answers
Changed how our engineers think about release risk, not just how fast they can ship
Cormac Whelan / VP of Engineering | Mar 13, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Unplanned downtime had become our biggest single cost line, and our own data suggested predictive maintenance could fix most of it — if we had the infrastructure to act on the signal.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Aug 2025 - Jan 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Cork, Ireland |
Questions & Answers
Attribution questions we'd given up asking are now answerable in a single dashboard
Soo-Ah Yoon / Director of Platform | Feb 10, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Our lean manufacturing push needed real-time OEE data at the line level, and our existing systems could only produce it through hours of manual spreadsheet work each week.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Digital Marketing |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jul 2025 - Jan 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Daegu, South Korea |
Questions & Answers
Improved both the outcome and the monthly cost line at the same time
Fiona McAllister / Chief Technology Officer | Feb 02, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jun 2025 - Nov 2025 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Glasgow, UK |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

