Details
| Founded: | 2015 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.1
6 Reviews
|
Industries Served
About
It is a high technology company with primary focus on a mobile app. They have changed the way media is consumed and propagated on the internet and in mobile space by empowering brands and companies with utilities and that can help them easily interact with consumers. Here, they recognize we are not building a company but a whole industry and we strive to ensure our growth is tied to growth in the whole entertainment ecosystem.
Noor Muscat Technology Reviews
The rebuilt site went from something we apologized for to something our sales team leads with
Faisal Al-Dosari / Head of Innovation | May 29, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Web Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Dec 2025 - Apr 2026 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Dammam, Saudi Arabia |
Questions & Answers
Monetization was integrated in a way players tolerated rather than resented
Bartosz Nowicki / Head of Development | May 18, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 3.5 Quality |
| 3.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Kraków, Poland |
Questions & Answers
A partner who guarded our roadmap the way we would have guarded it ourselves
Tanner Ridgeway / VP of Operations Technology | Apr 22, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Oct 2025 - Mar 2026 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Nicolas Fontaine / Directeur Technique | Mar 14, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Industry-Specific Solutions |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Apr 2025 - Jan 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | Lyon, France |
Questions & Answers
Firmware, cloud layer, and dashboard actually talk to each other cleanly — rarer than it should be
Aoibhinn Molloy / Director of Product | Feb 08, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jul 2025 - Jan 2026 |
| Business Type: | Agriculture |
|---|---|
| Location: | Galway, Ireland |
Questions & Answers
Performance testing caught a latency problem three weeks ahead of our busiest traffic day
Henrik Schuster / VP of Technology | Feb 05, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Dynamic pricing had been run manually for years. We knew the revenue upside was real but had no in-house way to build the models and wire them into the booking engine.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Nov 2025 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Bremen, Germany |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

