Details
| Founded: | 2010 |
|---|---|
| Hourly Rates: | $100 - $149 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.5
6 Reviews
|
Industries Served
About
New Haircut is an emerging mobile app developer in Berlin. It presents a wide range of app development services, from design to development. They provide mobile app development services for startups, digital agencies & enterprises. They hand hold their every client from the day they make a prototype till they assure that the app is performing well in the market.
New Haircut Reviews
Daily active usage on the app has stayed well above what we projected at launch
Rodrigo Cardoso / VP of Technology | May 02, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Feb 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Accessibility work broadened our reach and impressed clients we didn't expect it to matter to
Amal Al-Hosani / Head of Digital Strategy | Feb 18, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Unplanned downtime had become our biggest single cost line, and our own data suggested predictive maintenance could fix most of it — if we had the infrastructure to act on the signal.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Jan 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Dubai, UAE |
Questions & Answers
Changed how our engineers think about release risk, not just how fast they can ship
Griffin Ashcombe / Managing Director, Tech | Feb 06, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Track-and-trace had gone from a nice-to-have to something every RFP now required, and our platform simply didn't have it. We needed to close that gap before our next tender round.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Aug 2025 - Nov 2025 |
| Business Type: | Logistics & Supply Chain |
|---|---|
| Location: | San Francisco, USA |
Questions & Answers
Custom build that quietly replaced three separate off-the-shelf tools we were juggling before
Aoibhinn Molloy / Director of Product | Jan 07, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Aug 2025 - Nov 2025 |
| Business Type: | Construction |
|---|---|
| Location: | Galway, Ireland |
Questions & Answers
Scaled from a ten-unit pilot to full fleet deployment without a single architectural rework
Margaux Lefèvre / Head of Digital Products | Jan 02, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our funnel data made it obvious exactly where we were losing customers, and it wasn't subtle. We needed a platform capable of the experience our competitors were already delivering.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Feb 2025 - Nov 2025 |
| Business Type: | Retail & E-commerce |
|---|---|
| Location: | Nice, France |
Questions & Answers
Embedded deeply enough to understand our business, not just our ticket backlog
Bianca Alvarado / Chief Product Officer | Jan 01, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our LMS had been designed for a classroom-only world, and two years of declining satisfaction scores made the hybrid-delivery gaps impossible to ignore any longer.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jan 2025 - Oct 2025 |
| Business Type: | Education |
|---|---|
| Location: | San Diego, USA |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

