Details
| Founded: | 2013 |
|---|---|
| Hourly Rates: | $50 - $99 |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.3
8 Reviews
|
Industries Served
About
They take care of all of your development requirements from the very start to end, while you concentrate on your company operations. Their philosophy is based on the agile methodology for development. They involve their customers in the full product creation process, from idea to launch, this way they feel part of the work and have us create exactly what they want.
Navilo Mobile Reviews
Execution matched the proposal on every dimension that actually mattered to us
Grayson Whitfield / VP of Engineering | Jun 11, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Our lean manufacturing push needed real-time OEE data at the line level, and our existing systems could only produce it through hours of manual spreadsheet work each week.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Dec 2025 - Apr 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Boston, USA |
Questions & Answers
Built data foundations solid enough that we won't need to revisit them for years
Cormac Whelan / VP of Engineering | May 30, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Data & Analytics |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Sep 2025 - Mar 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Cork, Ireland |
Questions & Answers
A team that clearly played the game obsessively before building a single feature
Henrik Schuster / VP of Technology | May 20, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Dynamic pricing had been run manually for years. We knew the revenue upside was real but had no in-house way to build the models and wire them into the booking engine.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Oct 2025 - Apr 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Bremen, Germany |
Questions & Answers
The return on this investment outpaced the business case we originally approved
Roisin Cassidy / VP of Product Engineering | May 13, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Industry-Specific Solutions |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Belfast, UK |
Questions & Answers
Friday deployments finally feel routine instead of something to brace for
Reem Al-Ghamdi / VP of Engineering | May 11, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jan 2026 - Apr 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Riyadh, Saudi Arabia |
Questions & Answers
The return on this investment outpaced the business case we originally approved
Morgan Ellsworth / Head of Digital Health | Apr 20, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our trading platform had been patched together for close to a decade. Latency was creeping up, technical debt was compounding, and a proper rebuild had stopped being optional.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Financial Services |
|---|---|
| Location: | Phoenix, USA |
Questions & Answers
Compliance program landed on time and cleared the regulator without a single remediation note
Karthik Iyengar / Head of Platform | Feb 26, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
How long it took us to launch a new tariff had become a genuine competitive disadvantage, and the product configuration layer was the obvious bottleneck to fix first.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cybersecurity |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Apr 2025 - Dec 2025 |
| Business Type: | Telecommunications |
|---|---|
| Location: | Coimbatore, India |
Questions & Answers
Editorial team adopted this without escalating a single support ticket
Hamza Farooqi / Co-Founder & CTO | Jan 10, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Feb 2025 - Nov 2025 |
| Business Type: | Education |
|---|---|
| Location: | Karachi, Pakistan |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

