Details
| Founded: | 2014 |
|---|---|
| Hourly Rates: | $25 - $49 |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $2,500,000+ |
| Ratings: |
4.2
6 Reviews
|
Industries Served
About
They are a Vilnius-based digital company that creates web applications and mobile applications for clients worldwide. They always strive to know the process in order to produce effective solutions. Their aim from the starting has been to design, develop, and produce solutions that are specific to the demands of their clients.
Ivejas Reviews
Delivered with the change management and documentation a project this size actually needs
Rodrigo Cardoso / VP of Technology | Jun 07, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Our campaign workflow had sprawled across a dozen disconnected tools with constant manual reconciliation. It was slowing us down and introducing errors we couldn't afford.
| 4.0 Overall Rating |
| 4.5 Quality |
| 3.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Dec 2025 - May 2026 |
| Business Type: | Advertising & Marketing |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Took our security posture from a known weakness to something we now lead with in sales calls
Ritika Bhattacharya / VP of Product | May 11, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Unplanned downtime had become our biggest single cost line, and our own data suggested predictive maintenance could fix most of it — if we had the infrastructure to act on the signal.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cybersecurity |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jul 2025 - Mar 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Ahmedabad, India |
Questions & Answers
Delivered with the change management and documentation a project this size actually needs
Cormac Whelan / VP of Engineering | Mar 10, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Sep 2025 - Feb 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Cork, Ireland |
Questions & Answers
The immersive demo generated more press coverage than anything we'd shipped in years
Kenji Watanabe / Director of IT Strategy | Jan 19, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Track-and-trace had gone from a nice-to-have to something every RFP now required, and our platform simply didn't have it. We needed to close that gap before our next tender round.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Aug 2025 - Dec 2025 |
| Business Type: | Logistics & Supply Chain |
|---|---|
| Location: | Yokohama, Japan |
Questions & Answers
They built what we actually needed, which wasn't quite what we originally asked for
Larissa Nogueira / Chief Digital Officer | Jan 12, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Apr 2025 - Oct 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Porto Alegre, Brazil |
Questions & Answers
Executives open these dashboards before they open anything else in the morning
Ananya Raman / Director of Engineering | Jan 09, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Portal usability complaints were showing up disproportionately among the B2B accounts we were about to lose at renewal. The self-service experience needed a full rebuild before that cycle hit.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Data & Analytics |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Mar 2025 - Dec 2025 |
| Business Type: | Telecommunications |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

