Details
| Founded: | 2010 |
|---|---|
| Hourly Rates: | $50 - $99 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $2,500,000+ |
| Ratings: |
4.1
7 Reviews
|
Industries Served
About
They know how much their employees can handle when they’re ready to provide their best work, and which one will be most effective with specific difficulties related to web & mobile app development. They like to taking action. They do their best to engage both their local and professional communities. They are continually getting experience and drawing from both ends of the spectrum – from both the corporate and the startup world.
In'saneLab Reviews
Brought coherence to a product carrying four years of accumulated visual inconsistency
Willem Jansen / Chief Technology Officer | Apr 17, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Buyer behavior had gone fully digital-first and our search experience had quietly become a liability. It needed to match the quality of the listings it was supposed to represent.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Oct 2025 - Jan 2026 |
| Business Type: | Real Estate |
|---|---|
| Location: | Rotterdam, Netherlands |
Questions & Answers
Headless CMS let our designers and developers finally work in parallel instead of in sequence
Mahnoor Sheikh / Head of Technology | Apr 13, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Grid modernization funding required us to prove demand-response capability. The models existed on paper — we needed engineers to actually build and run them in production.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Faisalabad, Pakistan |
Questions & Answers
Execution matched the proposal on every dimension that actually mattered to us
Marcus Teo / CTO | Mar 22, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Industry-Specific Solutions |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Jan 2026 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Singapore |
Questions & Answers
Resolved a network fault at 2am before a single person walked into the office
Rashid Al-Marzouqi / Chief Technology Officer | Mar 21, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Dec 2025 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Sharjah, UAE |
Questions & Answers
The infrastructure paid for itself inside of two quarters
Konstantin Bauer / Leiter Digitalisierung | Mar 07, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Mar 2025 - Dec 2025 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Munich, Germany |
Questions & Answers
Performance testing caught a latency problem three weeks ahead of our busiest traffic day
Rodrigo Cardoso / VP of Technology | Feb 25, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Apr 2025 - Jan 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
The rebuilt site went from something we apologized for to something our sales team leads with
Delphine Rousseau / Director of Platform Engineering | Feb 23, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Buyer behavior had gone fully digital-first and our search experience had quietly become a liability. It needed to match the quality of the listings it was supposed to represent.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Web Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Aug 2025 - Jan 2026 |
| Business Type: | Real Estate |
|---|---|
| Location: | Vancouver, Canada |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

