Details
| Founded: | 2016 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.7
7 Reviews
|
Industries Served
About
It is a team of expert-driven individuals who appeared together to resolve the pain that is mobile app development. Their mission is around more than technology; it’s about connections. They allow people & organizations to join, fasten, and transmit efficiently with easy to use, high-quality mobile apps. With their fast app development platform & extremely open architecture, they will be here to help you both now and greatly into the future.
IdealApps Reviews
Multiplayer infrastructure held through a launch-day spike we hadn't fully planned for
Percy Wren / Director of eCommerce | Jun 05, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jun 2025 - Mar 2026 |
| Business Type: | Gaming & Gambling |
|---|---|
| Location: | Birmingham, UK |
Questions & Answers
Marketing automation and the sales pipeline are now properly connected for the first time
Margaux Lefèvre / Head of Digital Products | Apr 28, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
New digital service standards required every citizen-facing application to hit accessibility and performance benchmarks our legacy systems simply couldn't reach. Patching them wasn't realistic.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CRM Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Nov 2025 - Mar 2026 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Nice, France |
Questions & Answers
Outperformed our old in-house desk on every SLA metric we track
Min-Jun Kang / VP of Engineering | Apr 09, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | Busan, South Korea |
Questions & Answers
Launched at a 4.6 store rating with no critical bugs reported in the first two weeks
Faisal Al-Dosari / Head of Innovation | Mar 04, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Sep 2025 - Feb 2026 |
| Business Type: | Education |
|---|---|
| Location: | Dammam, Saudi Arabia |
Questions & Answers
Gave us an honest read of where we stood, then a credible plan to move from there
Anjali Raghunathan / VP of Data Science | Feb 15, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Mar 2025 - Dec 2025 |
| Business Type: | Education |
|---|---|
| Location: | Seattle, USA |
Questions & Answers
The return on this investment outpaced the business case we originally approved
Karthik Iyengar / Head of Platform | Feb 04, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our connected vehicle platform needed to handle telemetry from a growing EV fleet while also managing over-the-air update rollouts, and nothing off the shelf handled both well.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | POS System Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jun 2025 - Nov 2025 |
| Business Type: | Automotive |
|---|---|
| Location: | Coimbatore, India |
Questions & Answers
Technically sharp, commercially sensible, and genuinely easy to work with throughout
Angus Fairbanks / Chief Digital Officer | Jan 13, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jun 2025 - Oct 2025 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Brisbane, Australia |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

