Details
| Founded: | 2011 |
|---|---|
| Hourly Rates: | $50 - $99 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.2
6 Reviews
|
Industries Served
About
At Highness, they have streamlined the commitment process, knowing that time is of nature. They work with clients in a practical & clear style and use the latest tools & technologies to provide an effective platform for fruitful co-operation. They use established technologies that acknowledge making reliable, high-traffic solutions.
Highness Reviews
Smart contract audit was rigorous enough that our legal team signed off without a single note
Ananya Raman / Director of Engineering | Jun 03, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | May 2025 - Mar 2026 |
| Business Type: | Gaming & Gambling |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Matilda Osborne / Head of Engineering | Jun 02, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
We hold vendors to the same standard our own clients hold us to, so the bar for this engagement was never going to be low. We needed a partner comfortable being measured against it.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Industry-Specific Solutions |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Aug 2025 - Apr 2026 |
| Business Type: | Information Technology |
|---|---|
| Location: | Adelaide, Australia |
Questions & Answers
Product teams can finally move independently instead of queuing behind each other
Preston Locke / Director of Technology | May 07, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our campaign workflow had sprawled across a dozen disconnected tools with constant manual reconciliation. It was slowing us down and introducing errors we couldn't afford.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Feb 2026 |
| Business Type: | Advertising & Marketing |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
Compliance program landed on time and cleared the regulator without a single remediation note
Soo-Ah Yoon / Director of Platform | Mar 29, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our LMS had been designed for a classroom-only world, and two years of declining satisfaction scores made the hybrid-delivery gaps impossible to ignore any longer.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cybersecurity |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jun 2025 - Dec 2025 |
| Business Type: | Education |
|---|---|
| Location: | Daegu, South Korea |
Questions & Answers
A partner who guarded our roadmap the way we would have guarded it ourselves
Min-Jun Kang / VP of Engineering | Feb 04, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Oct 2025 - Jan 2026 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Busan, South Korea |
Questions & Answers
The research surfaced friction points we'd stopped noticing because they'd always been there
Reem Al-Ghamdi / VP of Engineering | Jan 07, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jul 2025 - Nov 2025 |
| Business Type: | Education |
|---|---|
| Location: | Riyadh, Saudi Arabia |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

