Details
| Founded: | 2008 |
|---|---|
| Hourly Rates: | $150 - $199 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.1
7 Reviews
|
Industries Served
About
It is a various kind of design and development company. They join the idea that needs can change. Their process allows great flexibility with access to their best available ways as needed. Their process offers great flexibility with access to their best available ways as required. This startup has a team of extraordinary talents & they have a skilled product team who scopes your ideas into an excellent product.
Hashrocket Reviews
Headless setup finally let content and engineering ship independently of each other
Reem Al-Ghamdi / VP of Engineering | Jun 05, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | E-commerce Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Sep 2025 - Apr 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Riyadh, Saudi Arabia |
Questions & Answers
Went live on the date we agreed to, which anyone who's done an ERP rollout knows is rare
Elin Holmqvist / Head of Product Engineering | May 25, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Sep 2025 - Feb 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Uppsala, Sweden |
Questions & Answers
Daily active usage on the app has stayed well above what we projected at launch
Preston Locke / Director of Technology | May 12, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Education |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
Certification time dropped and trainees actually prefer the VR module over the old process
Morgan Ellsworth / Head of Digital Health | Apr 27, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Apr 2025 - Jan 2026 |
| Business Type: | Fashion & Apparel |
|---|---|
| Location: | Phoenix, USA |
Questions & Answers
Changed how our engineers think about release risk, not just how fast they can ship
Percy Wren / Director of eCommerce | Apr 10, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Unplanned downtime had become our biggest single cost line, and our own data suggested predictive maintenance could fix most of it — if we had the infrastructure to act on the signal.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jul 2025 - Feb 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Birmingham, UK |
Questions & Answers
They were thinking mobile-first before we'd even finished writing the brief
Roisin Cassidy / VP of Product Engineering | Apr 02, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jun 2025 - Mar 2026 |
| Business Type: | Education |
|---|---|
| Location: | Belfast, UK |
Questions & Answers
Headless setup finally let content and engineering ship independently of each other
Grayson Whitfield / VP of Engineering | Mar 12, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | E-commerce Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Aug 2025 - Jan 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Boston, USA |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

