Details
| Founded: | 1995 |
|---|---|
| Hourly Rates: | $25 - $49 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $2,500,000+ |
| Ratings: |
4.3
6 Reviews
|
Industries Served
About
Hangar Chile is a leading mobile app development company which specializes in the development of extensive strategic planning, business creativity, brand experience, design, plan and much more. They want to encourage you and help you innovate with their experience in major names. Their team is responsive to develop best custom mobile app solutions based on the client demands.
Hangar Reviews
The first CMS rollout where editors asked for more of it, not less
Preston Locke / Director of Technology | Apr 22, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
A merger left us running two incompatible student information systems. We needed a consolidation plan that kept historical records intact and didn't interrupt term-time operations.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Oct 2025 - Jan 2026 |
| Business Type: | Education |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
Editorial team adopted this without escalating a single support ticket
Wei Ling Ong / VP of Engineering | Mar 04, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Our headcount had grown faster than our platform engineering depth. We needed an experienced team to close that gap while we hired, without letting quality or the roadmap slip in the meantime.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Information Technology |
|---|---|
| Location: | Singapore |
Questions & Answers
Handled twelve times normal traffic on our biggest sale day without a hiccup
Griffin Ashcombe / Managing Director, Tech | Feb 15, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our agents were spending more time reconciling data across disconnected tools than actually talking to clients. We needed one platform to give them that time back.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | E-commerce Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Dec 2025 |
| Business Type: | Real Estate |
|---|---|
| Location: | San Francisco, USA |
Questions & Answers
Editorial team adopted this without escalating a single support ticket
Ananya Raman / Director of Engineering | Feb 10, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.5 Overall Rating |
| 4.0 Quality |
| 5.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | May 2025 - Dec 2025 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Brought coherence to a product carrying four years of accumulated visual inconsistency
Aoibhinn Molloy / Director of Product | Jan 31, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Portal usability complaints were showing up disproportionately among the B2B accounts we were about to lose at renewal. The self-service experience needed a full rebuild before that cycle hit.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Mar 2025 - Dec 2025 |
| Business Type: | Telecommunications |
|---|---|
| Location: | Galway, Ireland |
Questions & Answers
They built what we actually needed, which wasn't quite what we originally asked for
Airi Kobayashi / Head of Product Development | Jan 03, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Nagoya, Japan |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

