Details
| Founded: | 2009 |
|---|---|
| Hourly Rates: | $100 - $149 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $2,500,000+ |
| Ratings: |
4.2
7 Reviews
|
Industries Served
About
They are a full-service mobile app development company. They resolve challenges through small screens. They are endured in connecting the horizon between different cultures & enterprise story. They always support your brand and increase your product or service with a cutting-edge visual statement. They take your product or idea from thought to product. It is one of the leading mobile app development company.
Fyresite Reviews
Our distributed team has effectively adopted the virtual space as its default meeting room
Aoibhinn Molloy / Director of Product | May 08, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Dec 2025 - Mar 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Galway, Ireland |
Questions & Answers
Multiplayer infrastructure held through a launch-day spike we hadn't fully planned for
Elin Holmqvist / Head of Product Engineering | Apr 28, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Sep 2025 - Mar 2026 |
| Business Type: | Fashion & Apparel |
|---|---|
| Location: | Uppsala, Sweden |
Questions & Answers
A team that clearly played the game obsessively before building a single feature
Franziska Wagner / Chief Innovation Officer | Mar 29, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Unplanned downtime had become our biggest single cost line, and our own data suggested predictive maintenance could fix most of it — if we had the infrastructure to act on the signal.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jul 2025 - Jan 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Frankfurt, Germany |
Questions & Answers
Makes you wonder why we tolerated the previous site's load times for as long as we did
Rodrigo Cardoso / VP of Technology | Mar 23, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Unplanned downtime had become our biggest single cost line, and our own data suggested predictive maintenance could fix most of it — if we had the infrastructure to act on the signal.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Web Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Mar 2025 - Dec 2025 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Delivered exactly what the brief asked for, then kept improving past that point anyway
Kenji Watanabe / Director of IT Strategy | Feb 23, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Feb 2025 - Dec 2025 |
| Business Type: | Construction |
|---|---|
| Location: | Yokohama, Japan |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Preston Locke / Director of Technology | Jan 18, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our headcount had grown faster than our platform engineering depth. We needed an experienced team to close that gap while we hired, without letting quality or the roadmap slip in the meantime.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jul 2025 - Oct 2025 |
| Business Type: | Information Technology |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
Hit a 4.7 average in the App Store within the first six weeks of release
Karthik Iyengar / Head of Platform | Jan 16, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Buyer behavior had gone fully digital-first and our search experience had quietly become a liability. It needed to match the quality of the listings it was supposed to represent.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Aug 2025 - Dec 2025 |
| Business Type: | Real Estate |
|---|---|
| Location: | Coimbatore, India |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

