Details
| Founded: | 2002 |
|---|---|
| Hourly Rates: | $25 - $49 |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $10,000+ |
| Ratings: |
4.3
8 Reviews
|
Industries Served
About
They connect great ideas with design to improve business. They know what they are talking about and they will fulfill their promises to you. They work in partnership with a number of designers to match a style to your requirements. Their designers come to them to take your design to life. They take huge satisfaction in their work and client will love.
Fracture Reviews
Kept every bit of the old site's SEO equity while adding the features we actually needed
Preston Locke / Director of Technology | Jun 06, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Our funnel data made it obvious exactly where we were losing customers, and it wasn't subtle. We needed a platform capable of the experience our competitors were already delivering.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Dec 2025 - Apr 2026 |
| Business Type: | Retail & E-commerce |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
Optimized for actual business outcomes instead of the usual vanity metrics
Rashid Al-Marzouqi / Chief Technology Officer | Jun 02, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Digital Marketing |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Aug 2025 - May 2026 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Sharjah, UAE |
Questions & Answers
Time-to-publish dropped from days to under an hour
Roisin Cassidy / VP of Product Engineering | May 20, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Grid modernization funding required us to prove demand-response capability. The models existed on paper — we needed engineers to actually build and run them in production.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Dec 2025 - Apr 2026 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Belfast, UK |
Questions & Answers
The research surfaced friction points we'd stopped noticing because they'd always been there
Larissa Nogueira / Chief Digital Officer | May 08, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Unplanned downtime had become our biggest single cost line, and our own data suggested predictive maintenance could fix most of it — if we had the infrastructure to act on the signal.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Manufacturing |
|---|---|
| Location: | Porto Alegre, Brazil |
Questions & Answers
Decisions that used to run on gut feel now run on a model we can actually explain
Soo-Ah Yoon / Director of Platform | Apr 20, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AI & Machine Learning |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Oct 2025 - Mar 2026 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Daegu, South Korea |
Questions & Answers
Multi-region uptime has held above 99.9 percent since the day we went live
Anton Berggren / Chief Technology Officer | Apr 19, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Multi-touch attribution across our media mix was the single most requested capability from clients across our whole portfolio, and we couldn't deliver it without rebuilding the data layer underneath.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jun 2025 - Mar 2026 |
| Business Type: | Advertising & Marketing |
|---|---|
| Location: | Malmö, Sweden |
Questions & Answers
Executives open these dashboards before they open anything else in the morning
Nicolas Fontaine / Directeur Technique | Mar 24, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
New digital service standards required every citizen-facing application to hit accessibility and performance benchmarks our legacy systems simply couldn't reach. Patching them wasn't realistic.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Data & Analytics |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Aug 2025 - Jan 2026 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Lyon, France |
Questions & Answers
Brought coherence to a product carrying four years of accumulated visual inconsistency
Ananya Raman / Director of Engineering | Mar 01, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
How long it took us to launch a new tariff had become a genuine competitive disadvantage, and the product configuration layer was the obvious bottleneck to fix first.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Oct 2025 - Feb 2026 |
| Business Type: | Telecommunications |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

