Details
| Founded: | 2011 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | N/A |
| Avg. Project Cost: | $5,000,000+ |
| Ratings: |
4.1
7 Reviews
|
Industries Served
About
They develop applications for iOS platform and web. Whether you want to sell your modern product contributions ahead of the game or start your new venture off on the best foot which they can help. They have expertise in every type of mobile apps for all client types. They are honest and transparent. Their belief in themselves and the services they allow have permitted them to continue growing the way they have, over the years.
Floco Apps Reviews
Built once, felt native on both platforms — no compromise either side noticed
Bartosz Nowicki / Head of Development | Jun 01, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Kraków, Poland |
Questions & Answers
Delivered exactly what the brief asked for, then kept improving past that point anyway
Preston Locke / Director of Technology | Jun 01, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Dec 2025 - Mar 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
Consolidated seven legacy systems down into one coherent data model
Amal Al-Hosani / Head of Digital Strategy | May 20, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
The handoff between our clinic system and our patient app kept breaking in the same places. We needed a partner willing to own that integration end to end, not just patch it again.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Aug 2025 - Apr 2026 |
| Business Type: | Healthcare |
|---|---|
| Location: | Dubai, UAE |
Questions & Answers
Marketing now ships page updates themselves — no engineering ticket required anymore
Larissa Nogueira / Chief Digital Officer | Apr 27, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Web Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | Porto Alegre, Brazil |
Questions & Answers
Launched at a 4.6 store rating with no critical bugs reported in the first two weeks
Margaux Lefèvre / Head of Digital Products | Apr 10, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Nov 2025 - Mar 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Nice, France |
Questions & Answers
Performance testing caught a latency problem three weeks ahead of our busiest traffic day
Karthik Iyengar / Head of Platform | Jan 22, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
The handoff between our clinic system and our patient app kept breaking in the same places. We needed a partner willing to own that integration end to end, not just patch it again.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Dec 2025 |
| Business Type: | Healthcare |
|---|---|
| Location: | Coimbatore, India |
Questions & Answers
Multiplayer infrastructure held through a launch-day spike we hadn't fully planned for
Delphine Rousseau / Director of Platform Engineering | Jan 20, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.5 Quality |
| 3.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Nov 2025 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Vancouver, Canada |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

