Details
| Founded: | 2011 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $50,000+ |
| Ratings: |
4.5
8 Reviews
|
Industries Served
About
Fabric Digital Agency in Bahrain was established in 2011. They have a productive & collaborative web designers and developers who completely prepared with knowledge. They like working together to launch amazing brands online & digital user experiences. They pride themselves on their ability to inject their client's objectives into a valuable product. They promote your apps before & after an app release.
Fabric IT Reviews
Resolved a network fault at 2am before a single person walked into the office
Elin Holmqvist / Head of Product Engineering | May 31, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jul 2025 - Mar 2026 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Uppsala, Sweden |
Questions & Answers
Every conversion metric on the platform moved in the right direction after this redesign
Femke Visser / Head of Platform Engineering | May 10, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | The Hague, Netherlands |
Questions & Answers
Marketing now ships page updates themselves — no engineering ticket required anymore
Anton Berggren / Chief Technology Officer | Apr 10, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our headcount had grown faster than our platform engineering depth. We needed an experienced team to close that gap while we hired, without letting quality or the roadmap slip in the meantime.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Web Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Oct 2025 - Jan 2026 |
| Business Type: | Information Technology |
|---|---|
| Location: | Malmö, Sweden |
Questions & Answers
They built what we actually needed, which wasn't quite what we originally asked for
Reem Al-Ghamdi / VP of Engineering | Apr 04, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Mar 2026 |
| Business Type: | Agriculture |
|---|---|
| Location: | Riyadh, Saudi Arabia |
Questions & Answers
Technically sharp, commercially sensible, and genuinely easy to work with throughout
Tanner Ridgeway / VP of Operations Technology | Mar 17, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | May 2025 - Dec 2025 |
| Business Type: | Fashion & Apparel |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Time-to-publish dropped from days to under an hour
Airi Kobayashi / Head of Product Development | Feb 20, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
New digital service standards required every citizen-facing application to hit accessibility and performance benchmarks our legacy systems simply couldn't reach. Patching them wasn't realistic.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Aug 2025 - Nov 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Nagoya, Japan |
Questions & Answers
A real single source of truth — rarer in practice than it sounds on paper
Bianca Alvarado / Chief Product Officer | Feb 05, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
New open banking rules meant our API layer needed rebuilding from scratch, with compliance designed in from the start rather than patched on afterward.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Data & Analytics |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Feb 2025 - Nov 2025 |
| Business Type: | Financial Services |
|---|---|
| Location: | San Diego, USA |
Questions & Answers
Rare skill: explained serious findings clearly to people with zero security background
Karthik Iyengar / Head of Platform | Jan 01, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cybersecurity |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jul 2025 - Oct 2025 |
| Business Type: | Human Resources |
|---|---|
| Location: | Coimbatore, India |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

