Details
| Founded: | 2003 |
|---|---|
| Hourly Rates: | $25 - $49 |
| Employees: | 500 - 999 |
| Avg. Project Cost: | $50,000+ |
| Ratings: |
4.1
8 Reviews
|
Industries Served
About
Epidata is a leading mobile app development company which provides high-performance software development solutions in a shorter time with lower risk. Their methods, technologies, and experience are the basis from which they build each of the projects that their customers need. Their team of mobile app developers & designers focus on making apps simple to use & blazing fast.
Epidata SA Reviews
Friday deployments finally feel routine instead of something to brace for
Roisin Cassidy / VP of Product Engineering | Jun 03, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jul 2025 - Apr 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Belfast, UK |
Questions & Answers
Designed around how our users actually behave, not the persona slide we'd been assuming
Aoibhinn Molloy / Director of Product | May 30, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Grid modernization funding required us to prove demand-response capability. The models existed on paper — we needed engineers to actually build and run them in production.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Dec 2025 - Apr 2026 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Galway, Ireland |
Questions & Answers
Technically sharp, commercially sensible, and genuinely easy to work with throughout
Amal Al-Hosani / Head of Digital Strategy | May 22, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Industry-Specific Solutions |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jan 2026 - Apr 2026 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Dubai, UAE |
Questions & Answers
Designed around how our users actually behave, not the persona slide we'd been assuming
Matilda Osborne / Head of Engineering | May 19, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Aug 2025 - Apr 2026 |
| Business Type: | Agriculture |
|---|---|
| Location: | Adelaide, Australia |
Questions & Answers
Every conversion metric on the platform moved in the right direction after this redesign
Ritika Bhattacharya / VP of Product | Apr 24, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jun 2025 - Feb 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Ahmedabad, India |
Questions & Answers
Smart contract audit was rigorous enough that our legal team signed off without a single note
Nicolas Fontaine / Directeur Technique | Mar 13, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
New traceability legislation brought a hard serialization deadline. Our supply chain system needed targeted, specialist development to meet it — general-purpose expertise wasn't going to cut it.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Pharmaceuticals & Biotechnology |
|---|---|
| Location: | Lyon, France |
Questions & Answers
The infrastructure paid for itself inside of two quarters
Bianca Alvarado / Chief Product Officer | Mar 08, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Oct 2025 - Feb 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | San Diego, USA |
Questions & Answers
Performance testing caught a latency problem three weeks ahead of our busiest traffic day
Sameer Kapoor / Chief Data Officer | Mar 01, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our field service system hadn't seen a serious update in years, and a growing technician headcount combined with increasingly complex jobs had exposed every one of its limits.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Apr 2025 - Feb 2026 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Gurugram, India |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

