Details
| Founded: | 2007 |
|---|---|
| Hourly Rates: | $150 - $199 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $100,000+ |
| Ratings: |
4.4
8 Reviews
|
Industries Served
About
Their projects are controlled by best manners, collaboration, and impulse. By using each engagement as a business, they fully buy themselves in the success of their clients. They prefer to work on ideas started by founders that are strong and understand the importance of their process and why they do things separately.
Doejo Reviews
Modules built around how we actually operate instead of forcing us to change our process
Min-Jun Kang / VP of Engineering | Jun 04, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Matter management had quietly become a real drag on our fee earners' time — every hour on admin was an hour not spent on billable work. The case for fixing it wrote itself.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Dec 2025 - May 2026 |
| Business Type: | Legal Services |
|---|---|
| Location: | Busan, South Korea |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Agnieszka Zielińska / CTO | Mar 29, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
New digital service standards required every citizen-facing application to hit accessibility and performance benchmarks our legacy systems simply couldn't reach. Patching them wasn't realistic.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Aug 2025 - Mar 2026 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Poznań, Poland |
Questions & Answers
The infrastructure paid for itself inside of two quarters
Rodrigo Cardoso / VP of Technology | Mar 25, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our agents were spending more time reconciling data across disconnected tools than actually talking to clients. We needed one platform to give them that time back.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Apr 2025 - Jan 2026 |
| Business Type: | Real Estate |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Sensor network and the analytics layer on top were both handled by people who understood each half
Soo-Ah Yoon / Director of Platform | Feb 13, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 4.5 Overall Rating |
| 4.0 Quality |
| 5.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IoT Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jan 2025 - Nov 2025 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Daegu, South Korea |
Questions & Answers
Their architecture review steered us away from a vendor decision we would have regretted
Tanner Ridgeway / VP of Operations Technology | Jan 29, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jun 2025 - Oct 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Every line item in the scope was delivered, on schedule, and passed our review without rework
Karthik Iyengar / Head of Platform | Jan 27, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | May 2025 - Oct 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Coimbatore, India |
Questions & Answers
The return on this investment outpaced the business case we originally approved
Cormac Whelan / VP of Engineering | Jan 27, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our regulatory submission timelines needed a document platform that could handle version control, permissions, and audit trails at a scale our existing tools were never built for.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | POS System Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jun 2025 - Nov 2025 |
| Business Type: | Pharmaceuticals & Biotechnology |
|---|---|
| Location: | Cork, Ireland |
Questions & Answers
Decisions that used to run on gut feel now run on a model we can actually explain
Grayson Whitfield / VP of Engineering | Jan 08, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our connected vehicle platform needed to handle telemetry from a growing EV fleet while also managing over-the-air update rollouts, and nothing off the shelf handled both well.
| 4.5 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AI & Machine Learning |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Nov 2025 |
| Business Type: | Automotive |
|---|---|
| Location: | Boston, USA |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

