Details
| Founded: | 2015 |
|---|---|
| Hourly Rates: | $50 - $99 |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $50,000+ |
| Ratings: |
4.7
8 Reviews
|
Industries Served
About
A clear approach is the first step on the path to a strong mobile app for all types of companies. They believe that the best user experience can only be achieved with native mobile apps. They provide you an experience and desired results at allocated time-frame along with the cost-effective solution. They believe that the best user experience can particularly be achieved with native mobile apps.
Dision Reviews
Execution matched the proposal on every dimension that actually mattered to us
Bartosz Nowicki / Head of Development | Jun 01, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Dec 2025 - Apr 2026 |
| Business Type: | Gaming & Gambling |
|---|---|
| Location: | Kraków, Poland |
Questions & Answers
Collapsed a two-week release cycle down to same-day deployments
Femke Visser / Head of Platform Engineering | May 03, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Buyer behavior had gone fully digital-first and our search experience had quietly become a liability. It needed to match the quality of the listings it was supposed to represent.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Apr 2025 - Feb 2026 |
| Business Type: | Real Estate |
|---|---|
| Location: | The Hague, Netherlands |
Questions & Answers
Got our board, our CTO, and engineering aligned on strategy for the first time in years
Percy Wren / Director of eCommerce | Mar 20, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Feb 2026 |
| Business Type: | Gaming & Gambling |
|---|---|
| Location: | Birmingham, UK |
Questions & Answers
Our data science team became genuinely productive for what felt like the first time
Faisal Al-Dosari / Head of Innovation | Feb 28, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Our product thinking internally was solid, but our execution depth in this particular technical domain wasn't. We needed real specialists, not another generalist team.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Data & Analytics |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Feb 2025 - Dec 2025 |
| Business Type: | Gaming & Gambling |
|---|---|
| Location: | Dammam, Saudi Arabia |
Questions & Answers
Editorial team adopted this without escalating a single support ticket
Étienne Marchand / CTO | Feb 18, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Mar 2025 - Jan 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Ottawa, Canada |
Questions & Answers
Test automation got adopted by developers as a genuine tool, not a box-ticking exercise
Ananya Raman / Director of Engineering | Feb 18, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
How long it took us to launch a new tariff had become a genuine competitive disadvantage, and the product configuration layer was the obvious bottleneck to fix first.
| 5.0 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | May 2025 - Dec 2025 |
| Business Type: | Telecommunications |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Modules built around how we actually operate instead of forcing us to change our process
Hamza Farooqi / Co-Founder & CTO | Jan 25, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Our actuarial models had outgrown the reporting pipeline feeding them, and the resulting data lag was introducing real risk into pricing decisions the business wasn't comfortable carrying anymore.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Mar 2025 - Dec 2025 |
| Business Type: | Insurance |
|---|---|
| Location: | Karachi, Pakistan |
Questions & Answers
Rare skill: explained serious findings clearly to people with zero security background
Tanner Ridgeway / VP of Operations Technology | Jan 19, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cybersecurity |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | May 2025 - Nov 2025 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

