Details
| Founded: | N/A |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $5,000,000+ |
| Ratings: |
4.4
6 Reviews
|
Industries Served
About
Danitt was established to help you take pleasure in these changes. They help companies grow revenue by exposing them to new marketplaces, developing their web image, and by making the products that can be resold or done to improve their services. Their purpose is to help companies take advantage of all of the services offered to them by modern technology. They have worked with many clients and they always prefer to understand they come out from the service happy & satisfied.
Danitt Reviews
Got our board, our CTO, and engineering aligned on strategy for the first time in years
Amal Al-Hosani / Head of Digital Strategy | Jun 01, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Dec 2025 - May 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Dubai, UAE |
Questions & Answers
Technically sharp, commercially sensible, and genuinely easy to work with throughout
Soo-Ah Yoon / Director of Platform | May 14, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Embedded Systems Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Sep 2025 - Feb 2026 |
| Business Type: | Sports & Fitness |
|---|---|
| Location: | Daegu, South Korea |
Questions & Answers
Brought coherence to a product carrying four years of accumulated visual inconsistency
Femke Visser / Head of Platform Engineering | Mar 18, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | May 2025 - Feb 2026 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | The Hague, Netherlands |
Questions & Answers
Custom build that quietly replaced three separate off-the-shelf tools we were juggling before
Roisin Cassidy / VP of Product Engineering | Mar 08, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our LMS had been designed for a classroom-only world, and two years of declining satisfaction scores made the hybrid-delivery gaps impossible to ignore any longer.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Apr 2025 - Dec 2025 |
| Business Type: | Education |
|---|---|
| Location: | Belfast, UK |
Questions & Answers
Built once, felt native on both platforms — no compromise either side noticed
Tanner Ridgeway / VP of Operations Technology | Feb 18, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Track-and-trace had gone from a nice-to-have to something every RFP now required, and our platform simply didn't have it. We needed to close that gap before our next tender round.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Aug 2025 - Nov 2025 |
| Business Type: | Logistics & Supply Chain |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Brought coherence to a product carrying four years of accumulated visual inconsistency
Wei Ling Ong / VP of Engineering | Jan 12, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Singapore |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

