Details
| Founded: | 2003 |
|---|---|
| Hourly Rates: | $100 - $149 |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $100,000+ |
| Ratings: |
4.3
8 Reviews
|
Industries Served
About
Creative Slice is an award-winning web design firm, established in 2003, that is focused on taking our clients to the next level of business development. Their client base is very diverse and ranges from international resorts to small, community-based nonprofits that emphasize sustainable and green development. They are always looking for talented designers and programmers to work with them on new projects.
Creative Slice Reviews
Delivered with the change management and documentation a project this size actually needs
Rodrigo Cardoso / VP of Technology | Jun 07, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Sep 2025 - May 2026 |
| Business Type: | Construction |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Treated our product's quality like it was their own reputation on the line
Agnieszka Zielińska / CTO | May 29, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Dynamic pricing had been run manually for years. We knew the revenue upside was real but had no in-house way to build the models and wire them into the booking engine.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Quality Assurance & Testing |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Dec 2025 - Mar 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Poznań, Poland |
Questions & Answers
Had something running in production for the board to see inside of two months
Rashid Al-Marzouqi / Chief Technology Officer | May 08, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
First notice of loss was taking us three days on average against a market benchmark of under four hours. Automating that intake and triage step became the clear priority.
| 4.0 Overall Rating |
| 3.5 Quality |
| 3.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AI & Machine Learning |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Nov 2025 - Apr 2026 |
| Business Type: | Insurance |
|---|---|
| Location: | Sharjah, UAE |
Questions & Answers
The return on this investment outpaced the business case we originally approved
Wei Ling Ong / VP of Engineering | Mar 30, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
We hold vendors to the same standard our own clients hold us to, so the bar for this engagement was never going to be low. We needed a partner comfortable being measured against it.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jul 2025 - Mar 2026 |
| Business Type: | Information Technology |
|---|---|
| Location: | Singapore |
Questions & Answers
Every conversion metric on the platform moved in the right direction after this redesign
Bartosz Nowicki / Head of Development | Mar 20, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jun 2025 - Dec 2025 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Kraków, Poland |
Questions & Answers
Our SRE team now points new hires to this setup as the reference example
Fiona McAllister / Chief Technology Officer | Mar 19, 2026Five months post-launch, we're running at roughly double the transaction volume we'd specified in the original scope document, and the platform hasn't needed a single structural change to handle it. That's the real tell for whether a team designed for what you told them versus what you were actually going to need. We're now scoping a second phase and I expect this to be a multi-year relationship at this point.
Project summary
Dynamic pricing had been run manually for years. We knew the revenue upside was real but had no in-house way to build the models and wire them into the booking engine.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Glasgow, UK |
Questions & Answers
Delivered exactly what the brief asked for, then kept improving past that point anyway
Matilda Osborne / Head of Engineering | Mar 13, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Audience data was scattered across eight different tools with no shared identity layer. Personalization was never going to work until that foundation got fixed first.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Mar 2025 - Jan 2026 |
| Business Type: | Media & Entertainment |
|---|---|
| Location: | Adelaide, Australia |
Questions & Answers
Got our board, our CTO, and engineering aligned on strategy for the first time in years
Min-Jun Kang / VP of Engineering | Jan 21, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.5 Overall Rating |
| 4.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | May 2025 - Nov 2025 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Busan, South Korea |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

