Details
| Founded: | 2010 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $2,500,000+ |
| Ratings: |
4.3
6 Reviews
|
Industries Served
About
It is a digital company which offers useful mobile applications with good experiences, with a strong, solid & iterative process. From idea to start, the team assures amazing nature of the deliverables & power of the way. Most of the skilled developers do programming not just they require to get paid or get support from the public, but as it is a pleasure to develop.
Cream-Touch Reviews
The rebuilt site went from something we apologized for to something our sales team leads with
Anjali Raghunathan / VP of Data Science | Jun 07, 2026Looking back, the thing that stands out most is how uneventful the whole project was. Technology projects of this size tend to generate their share of fire drills and awkward escalation calls. This one really didn't. Issues got flagged early enough that they never became incidents, scope changes went through an actual process instead of a tense phone call, and risks were tracked rather than just hoped away. That kind of quiet competence is unusual in my experience, and it made the whole thing feel easier on our end than I know it was on theirs.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Web Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Sep 2025 - Mar 2026 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Seattle, USA |
Questions & Answers
Delivered the sales visibility we'd been requesting internally for three years, in fourteen weeks
Bartosz Nowicki / Head of Development | May 10, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CRM Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | May 2025 - Mar 2026 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Kraków, Poland |
Questions & Answers
Built data foundations solid enough that we won't need to revisit them for years
Morgan Ellsworth / Head of Digital Health | Apr 10, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our funnel data made it obvious exactly where we were losing customers, and it wasn't subtle. We needed a platform capable of the experience our competitors were already delivering.
| 4.5 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Data & Analytics |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | May 2025 - Jan 2026 |
| Business Type: | Retail & E-commerce |
|---|---|
| Location: | Phoenix, USA |
Questions & Answers
Execution matched the proposal on every dimension that actually mattered to us
Hamza Farooqi / Co-Founder & CTO | Mar 23, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our funnel data made it obvious exactly where we were losing customers, and it wasn't subtle. We needed a platform capable of the experience our competitors were already delivering.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Industry-Specific Solutions |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Retail & E-commerce |
|---|---|
| Location: | Karachi, Pakistan |
Questions & Answers
Accessibility work broadened our reach and impressed clients we didn't expect it to matter to
Grayson Whitfield / VP of Engineering | Feb 21, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Feb 2025 - Nov 2025 |
| Business Type: | Nonprofit & NGO |
|---|---|
| Location: | Boston, USA |
Questions & Answers
Gameplay feel matched the original design intent — harder to nail than most people assume
Sameer Kapoor / Chief Data Officer | Jan 08, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Feb 2025 - Dec 2025 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Gurugram, India |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

