Details
| Founded: | 2004 |
|---|---|
| Hourly Rates: | $50 - $99 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $100,000+ |
| Ratings: |
4.1
8 Reviews
|
Industries Served
About
They are extremely enthusiastic about developing a highly functional application with unmatched aesthetics and an automatic user experience. They like to work on complex Enterprise projects and aspiring startup ideas. Their team has deep expertise in designing interfaces, a combination of third-party devices and apps, and usability testing for both web & mobile applications.
bromin7 Reviews
Headless setup finally let content and engineering ship independently of each other
Julian Ashworth / Head of Digital Strategy | Apr 08, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Dynamic pricing had been run manually for years. We knew the revenue upside was real but had no in-house way to build the models and wire them into the booking engine.
| 4.0 Overall Rating |
| 4.0 Quality |
| 3.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | E-commerce Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Sep 2025 - Mar 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | London, UK |
Questions & Answers
Two years post-launch and our engineers still hold this codebase up as the standard to match
Rashid Al-Marzouqi / Chief Technology Officer | Apr 07, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
We hold vendors to the same standard our own clients hold us to, so the bar for this engagement was never going to be low. We needed a partner comfortable being measured against it.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Software Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Mar 2025 - Jan 2026 |
| Business Type: | Information Technology |
|---|---|
| Location: | Sharjah, UAE |
Questions & Answers
Delivered with the change management and documentation a project this size actually needs
Preston Locke / Director of Technology | Mar 28, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 3.5 Quality |
| 3.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | ERP Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Mar 2025 - Dec 2025 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
Started as a single project and earned a permanent spot on our preferred vendor list
Airi Kobayashi / Head of Product Development | Mar 24, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our headcount had grown faster than our platform engineering depth. We needed an experienced team to close that gap while we hired, without letting quality or the roadmap slip in the meantime.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Aug 2025 - Jan 2026 |
| Business Type: | Information Technology |
|---|---|
| Location: | Nagoya, Japan |
Questions & Answers
Improved both the outcome and the monthly cost line at the same time
Ananya Raman / Director of Engineering | Mar 17, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Grid modernization funding required us to prove demand-response capability. The models existed on paper — we needed engineers to actually build and run them in production.
| 4.0 Overall Rating |
| 4.5 Quality |
| 3.5 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Dec 2025 |
| Business Type: | Energy & Utilities |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Migrated without the outages and rollback drama our first attempt at this produced
Grayson Whitfield / VP of Engineering | Mar 08, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Portal usability complaints were showing up disproportionately among the B2B accounts we were about to lose at renewal. The self-service experience needed a full rebuild before that cycle hit.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cloud Services |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jul 2025 - Feb 2026 |
| Business Type: | Telecommunications |
|---|---|
| Location: | Boston, USA |
Questions & Answers
Built data foundations solid enough that we won't need to revisit them for years
Tanner Ridgeway / VP of Operations Technology | Mar 03, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Warehouse errors were becoming visible to clients, not just internal reporting. A modernized WMS was already the agreed direction internally — we just needed someone to actually build it.
| 4.5 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Data & Analytics |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Jul 2025 - Jan 2026 |
| Business Type: | Logistics & Supply Chain |
|---|---|
| Location: | Salt Lake City, USA |
Questions & Answers
Product teams can finally move independently instead of queuing behind each other
Henrik Schuster / VP of Technology | Jan 15, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jul 2025 - Nov 2025 |
| Business Type: | Aerospace & Defense |
|---|---|
| Location: | Bremen, Germany |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

