Details
| Founded: | 2000 |
|---|---|
| Hourly Rates: | $100 - $149 |
| Employees: | 10 - 49 |
| Avg. Project Cost: | $5,000,000+ |
| Ratings: |
4.1
6 Reviews
|
Industries Served
About
They partner with ambitious brands to make and optimize digital experiences with a goal of increasing conversions and driving customer loyalty. Their team has been serving clients across the country successfully for almost two decades and they are headquartered in the world’s best city, Charleston, SC. They have fun & bring a sense of joy to our work. It is a leading mobile app development company. They have capabilities to stay cool & professional under stress.
BlueKey Reviews
Accessibility work broadened our reach and impressed clients we didn't expect it to matter to
Anton Berggren / Chief Technology Officer | Apr 27, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Our app was sitting at a 2.9-star average, and nearly every negative review mentioned the same two things: speed and how convoluted the booking flow had become.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | UI/UX Design |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Nov 2025 - Feb 2026 |
| Business Type: | Travel & Hospitality |
|---|---|
| Location: | Malmö, Sweden |
Questions & Answers
Session length jumped 30-plus percent after the AR feature went live
Percy Wren / Director of eCommerce | Apr 24, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Nov 2025 - Mar 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Birmingham, UK |
Questions & Answers
Got our board, our CTO, and engineering aligned on strategy for the first time in years
Airi Kobayashi / Head of Product Development | Feb 18, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 5.0 Quality |
| 4.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Consulting |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Aug 2025 - Jan 2026 |
| Business Type: | Agriculture |
|---|---|
| Location: | Nagoya, Japan |
Questions & Answers
Fulfilment and finance are as satisfied with this build as our customers are
Wei Ling Ong / VP of Engineering | Feb 17, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Cross-agency data sharing had been stuck for years because of incompatible systems. A secure integration layer was the prerequisite for nearly everything else on our roadmap.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | E-commerce Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | May 2025 - Nov 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Singapore |
Questions & Answers
Went from whitepaper to mainnet without a single incident worth mentioning
Rodrigo Cardoso / VP of Technology | Feb 05, 2026What actually moved the needle wasn't their ability to follow a spec — any competent team can do that. It was their willingness to push back when a requirement didn't make sense, explain clearly why, and help us decide on something better instead. That extra layer of judgment took the final product past what we'd actually asked for and closer to what we genuinely needed, which isn't always the same thing.
Project summary
Our regulatory submission timelines needed a document platform that could handle version control, permissions, and audit trails at a scale our existing tools were never built for.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jan 2025 - Nov 2025 |
| Business Type: | Pharmaceuticals & Biotechnology |
|---|---|
| Location: | Rio de Janeiro, Brazil |
Questions & Answers
Finally got sales, marketing, and customer success working from the same system
Amal Al-Hosani / Head of Digital Strategy | Jan 17, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 4.0 Overall Rating |
| 4.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CRM Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | May 2025 - Oct 2025 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Dubai, UAE |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

