Details
| Founded: | 2016 |
|---|---|
| Hourly Rates: | $25 - $49 |
| Employees: | 50 - 249 |
| Avg. Project Cost: | $100,000+ |
| Ratings: |
4.8
6 Reviews
|
Industries Served
About
BeDjango Team has the significant expertise in mobile app development. They have served their apps to various industries and companies. Many clients of this company are still with them over the years. Their importance is depended on their teams. They work based on their strategies built to remain in this cut-throat competition.
BeDjango Reviews
Outperformed our old in-house desk on every SLA metric we track
Morgan Ellsworth / Head of Digital Health | Apr 29, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.5 Overall Rating |
| 4.0 Quality |
| 5.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jun 2025 - Jan 2026 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Phoenix, USA |
Questions & Answers
The return on this investment outpaced the business case we originally approved
Agnieszka Zielińska / CTO | Apr 18, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Audience data was scattered across eight different tools with no shared identity layer. Personalization was never going to work until that foundation got fixed first.
| 5.0 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Low-Code / No-Code Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Apr 2025 - Feb 2026 |
| Business Type: | Media & Entertainment |
|---|---|
| Location: | Poznań, Poland |
Questions & Answers
Built for real-world constraints, not just for how it would read in a pitch deck
Min-Jun Kang / VP of Engineering | Mar 25, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Mar 2025 - Jan 2026 |
| Business Type: | Human Resources |
|---|---|
| Location: | Busan, South Korea |
Questions & Answers
Hit a 4.7 average in the App Store within the first six weeks of release
Margaux Lefèvre / Head of Digital Products | Mar 15, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 5.0 Overall Rating |
| 5.0 Quality |
| 4.5 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Mobile App Development |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | May 2025 - Jan 2026 |
| Business Type: | Events & Event Management |
|---|---|
| Location: | Nice, France |
Questions & Answers
Time-to-publish dropped from days to under an hour
Henrik Schuster / VP of Technology | Jan 25, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Years of incremental patches had left us with a platform that technically worked but was quietly holding the business back strategically. A proper rebuild was the agreed way forward.
| 5.0 Overall Rating |
| 5.0 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Aug 2025 - Nov 2025 |
| Business Type: | Food & Beverage |
|---|---|
| Location: | Bremen, Germany |
Questions & Answers
Our internal teams have genuinely forgotten infrastructure used to be a source of stress
Ananya Raman / Director of Engineering | Jan 02, 2026This was our fourth agency in three years, and I say that with some embarrassment. Every previous engagement had looked promising on paper and fallen apart somewhere in delivery. What was different here was the sequencing: they spent real time understanding the actual problem before proposing anything, rather than pattern-matching to a solution they already knew how to sell. The build ran to schedule, our own engineers had genuinely positive things to say during handover, and four months into live operation we haven't had a single critical incident. We're already talking about the next phase with them.
Project summary
Our headcount had grown faster than our platform engineering depth. We needed an experienced team to close that gap while we hired, without letting quality or the roadmap slip in the meantime.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 5.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | IT Managed Services |
|---|---|
| Project Cost: | $10,000 to $49,999 |
| Project Duration: | Jul 2025 - Oct 2025 |
| Business Type: | Information Technology |
|---|---|
| Location: | Kochi, India |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

