Details
| Founded: | 2002 |
|---|---|
| Hourly Rates: | N/A |
| Employees: | 2 - 9 |
| Avg. Project Cost: | $100,000+ |
| Ratings: |
4.1
7 Reviews
|
Industries Served
About
They have a very good knowledge of the mobile technology space. They work to the highest standards and have an eye for detail. Their biggest strengths are taking projects from conception to launch, and keeping them well prepared. Their solutions cover business & personal potency ranging from small one on one apps to large enterprise solutions. To be powerful in the industries they provide with best-of-class mobile software solutions during pleasing their customers and developing a solid, stable atmosphere for their employees.
Appalachion Solutions Reviews
Built for real-world constraints, not just for how it would read in a pitch deck
Delphine Rousseau / Director of Platform Engineering | May 22, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
A previous project had worked fine in staging and fallen apart in production. We approached vendor selection this time with a lot more scrutiny as a direct result.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Blockchain Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Jun 2025 - Feb 2026 |
| Business Type: | Environmental Services |
|---|---|
| Location: | Vancouver, Canada |
Questions & Answers
A team that clearly played the game obsessively before building a single feature
Femke Visser / Head of Platform Engineering | Apr 19, 2026Our stakeholder list for this project included board members, operations leads, compliance, and end users, all with wildly different levels of technical fluency and different definitions of success. Managing that mix well is genuinely hard, and this team did it better than any vendor we've worked with. They shifted register depending on who they were talking to without ever dumbing down the substance, kept expectations honest the whole way through, and delivered something each group could point to as meeting their own bar. That range is rare.
Project summary
Portal usability complaints were showing up disproportionately among the B2B accounts we were about to lose at renewal. The self-service experience needed a full rebuild before that cycle hit.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Game Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | Jun 2025 - Jan 2026 |
| Business Type: | Telecommunications |
|---|---|
| Location: | The Hague, Netherlands |
Questions & Answers
Got the outcome we asked for, delivered the way we needed it, by people we'd hire again
Grayson Whitfield / VP of Engineering | Apr 06, 2026I went into this engagement genuinely skeptical. A previous vendor had left us with a system that technically worked but that nobody trusted, and I wasn't interested in repeating that experience. This team earned trust the slow way — solid discovery documentation, technical proposals that held up under scrutiny, sprints that landed when promised, and ultimately a production system that has simply behaved. I don't open conversations about them with caveats anymore.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | POS System Development |
|---|---|
| Project Cost: | $500,000+ |
| Project Duration: | May 2025 - Jan 2026 |
| Business Type: | Aerospace & Defense |
|---|---|
| Location: | Boston, USA |
Questions & Answers
The first CMS rollout where editors asked for more of it, not less
Angus Fairbanks / Chief Digital Officer | Mar 21, 2026The easiest thing to praise is the technical output itself — solid test coverage, a deployment pipeline that just works, documentation that people actually reference instead of ignoring. But what I keep coming back to is the number of conversations we haven't had to have since launch. No 2am incident calls. No emergency patches. No post-mortems about what went sideways. That absence is really the whole pitch, if you ask me.
Project summary
Our internal engineering capacity was fully committed to keeping existing systems running, with no room for a build of this size. An outside partner with the right depth was really our only option.
| 4.0 Overall Rating |
| 4.0 Quality |
| 4.0 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | CMS Development |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Oct 2025 - Feb 2026 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | Brisbane, Australia |
Questions & Answers
Certification time dropped and trainees actually prefer the VR module over the old process
Julian Ashworth / Head of Digital Strategy | Mar 21, 2026We handed this team an aggressive deadline, a genuinely complicated scope, and a client-side team on our end that was stretched thin and slow to respond at times. They handled all of it without complaint. When they needed something from us they asked precisely and on time. When they didn't, they just kept moving. The project still landed on schedule despite our side being the weaker link for a good chunk of it, which tells you something about how they operate under pressure.
Project summary
This project had a board-facing deadline tied to a wider strategic push. We needed a partner who'd treat that date like it was their own problem, not just ours.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.5 Schedule |
| 4.0 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | AR/VR Development |
|---|---|
| Project Cost: | Less than $10,000 |
| Project Duration: | Apr 2025 - Dec 2025 |
| Business Type: | Mining & Metals |
|---|---|
| Location: | London, UK |
Questions & Answers
Compliance program landed on time and cleared the regulator without a single remediation note
Preston Locke / Director of Technology | Mar 15, 2026We had proposals in hand ranging from roughly half to well over double what we eventually paid this team. What set their proposal apart wasn't the price — it was that the number matched what they actually delivered, almost line for line. I've been burned before by proposals that were really just opening offers in a negotiation that continues throughout the project. That wasn't the case here, and I don't say that lightly.
Project summary
New digital service standards required every citizen-facing application to hit accessibility and performance benchmarks our legacy systems simply couldn't reach. Patching them wasn't realistic.
| 4.5 Overall Rating |
| 4.5 Quality |
| 5.0 Schedule |
| 4.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | Cybersecurity |
|---|---|
| Project Cost: | $150,000 to $499,999 |
| Project Duration: | Jul 2025 - Dec 2025 |
| Business Type: | Government & Public Sector |
|---|---|
| Location: | Philadelphia, USA |
Questions & Answers
Collapsed a two-week release cycle down to same-day deployments
Faisal Al-Dosari / Head of Innovation | Feb 10, 2026Going in, the integration work was what worried me most. Our systems landscape is messy, a couple of the third-party APIs we depend on are barely documented, and one of those vendors has a well-earned reputation for slow, inconsistent support. This team absorbed all of that. They documented what the upstream providers wouldn't, built in resilience wherever the upstream behavior was flaky, and shipped something that has worked exactly as specified since go-live. I genuinely couldn't have asked for more on that front.
Project summary
Matter management had quietly become a real drag on our fee earners' time — every hour on admin was an hour not spent on billable work. The case for fixing it wrote itself.
| 4.0 Overall Rating |
| 3.5 Quality |
| 4.0 Schedule |
| 3.5 Project Cost |
| 5.0 Willing To Refer |
| Project Type: | DevOps Services |
|---|---|
| Project Cost: | $50,000 to $149,999 |
| Project Duration: | Feb 2025 - Dec 2025 |
| Business Type: | Legal Services |
|---|---|
| Location: | Dammam, Saudi Arabia |
Questions & Answers
Frequently Asked Questions
Got questions about our specialized technology solutions? We have the answers to help you make informed decisions.

